|
|
|
|
|
|
|
|
Working out of the stockpile |
|
|
|
|
|
|
|
|
|
Partially back filled trench |
|
|
|
|
|
|
|
|
|
|
|
|
54 inch Flared end at the retention pond |
|
|
|
|
|
|
|
|
Outfall at the retention pond |
|
|
|
|
|
|
|
|
|
Curb installation in progress |
|
|
|
|
|
|
|
|
|
First section of curb in project |
|
|
|
|
|
|
|
|
Pipe alignment being verified |
|
|
|
|
|
|
|
|
|
Setting headwall along Roesville Road |
|
|
|
|
|
|
|
|
Alignment of headwall being verified |
|
|
|
|
|
|
|
|
Pipe Trench being back filled |
|
|
|
|
|
|
|
|
Compaction test in progress |
|
|
|
|
|
|
|
|
Pipe crew between sections |
|
|
|
|
|
|
|
|
|
Storm Sewer Road Crossing being installed |
|
|
|
|
|
|
|
|
|
Walkway along Roesville Road Paved |
|
|
|
|
|
|
|
|
Raod Crossing Trench Paved |
|
|
|
|
|
|
|
|
Driveway to Office Trailer |
|
|
|
|
|
|
|
|
|
|
Sewer Main Trench being Backfilled |
|
|
|
|
|
|
|
|
Sanitary Sewer Main Installation |
|
|
|
|
|
|
|